Monday, July 6, 2015

Progress Report: July 6th



Preparing to load a 300 lb tool chest on-board. This will be stored in the main salon for the time being. 















Starting to refinish the cabinets. A three step process to kill the smoke smell. Stix Primer, Kilz and Acrylic paint.



Extra refrigerators we are cleaning and removing from the vessel. We will sell these and use the funds for supplies.

This space held a drawer fridge and wine cooler. We moved this refrigerator to the main salon and will sell the wine cooler. Another refrigerator from the upper deck will be placed here and used mainly for medicines when medical teams and shot clinics are on-board.

One of two ice makers we are trying to salvage. The smoke damage is heavy but we will do our best to clean them. The other unit is the wine cooler.








The shower cleaned up pretty well and it has good water pressure. The walls are a bit stained from the smoke damage and we may paint some time in the future. 

 What a difference in these walls! After trying various cleaners and techniques, we discovered a product called 'The Works' and applied it with a 'Mr. Clean Magic Eraser'.









 Two a/c units that were under the bunk in the captains quarters. They will be cleaned and then DJ will install the smaller back under the bunk. It will provide a/c for the cabin and adjacent helm area.


A lot of space under the bunk now that the a/c units and ducting have been removed. There is a lot of  dead space behind the bulkhead to the right. Eric will make lockers in this area.
 Lots of ducting removed from under the bunk.

Penny helping Eric look through the sanding/paint locker!