The two a/c units that were under the bunk in the captains quarters. After cleaning, the smaller one will be reinstalled back under the bunk and the larger one will go into the forward lower cabins.
Shelves for the dry storage (pantry) cabinets. Two of the small refrigerators and the wine cooler are under the drop cloths. We sold the refrigerators over the weekend and have one more to clean and list next Thursday.
The doors to the cabinets. These will get a minimum of three coats of varnish.
The first of the cabinet shelves in place. The rest of the shelves will be installed Monday.
We removed the flooring in the helm area and captains quarters. We will be cutting hatches and making lockers due to a large amount of open space underneath. Sanding paint and non-slip rugs will probably be all we need here when we are finished.
A pile of flooring and a/c ducting that was under the bunk in the captains quarters.
One section of the bench that was in the helm area. Once the temporary wood shop is out of the main salon, this will go along the wall by the door.
The drawers were pretty sooted but cleaned up fairly well.
The completed bench pieces are finished and will be stored in the main salon along the wall by the table for now.
This whole upper section of the captains quarters will be torn out. The mirror will be removed as well. On the right hand side we will build some open lockers and clean and paint underneath the bunk with kilz primer.
The heavy soot cleaning of the vinyl walls in the helm area is almost completed. Magic eraser and vinegar is doing a great job. We will eventually remove these panels but for now they will do.
What a difference!
They are still slightly stained at the top but still look great.
Wow, you have certainly been busy! Things are looking good :)