DJ
and Eric are in the planning stages for redoing the electrical and
plumbing systems. DJ is drawing up a new design to simplify both
systems and make them as energy efficient as possible. The ministry
will be purchasing the needed components shortly and shipping them to
the boat. There are items in the storage units in Sanford that will
also be needed for these upgrades as well as tools, equipment and
wood items for beginning the wood-shop and will be transported by
U-Haul. Eric and Mary will be planning their trip with the U-Haul as
soon as Eric can get a week or so off from his job here in Sanford.
Due
to the nature of the work we will be doing in the South Pacific we
need to be as self- sufficient and self-contained as possible. Our
goal is to remain on the move, doing as much work as possible, for as
many people and islands as possible, for as long as possible. The
simpler the systems, the easier they will be to maintain.