Saturday, August 27, 2016

Progress Update: August 27th


On July 28th, Eric was rudely interrupted by a heart attack. He received two stents. The main artery to his heart was 99% blocked. He's recovering now and getting much better! 
Progress has resumed although Eric is working on a small side job to help pay some of our personal bills so he is split between the two jobs for a short time. 

( Eric prepping for the FRP panels)




The shop overhead is finished! The black area is the emergency hatch.


The top outer 1/4 section of the door frame for the lower head was too badly burned and could not be salvaged. Eric made new pieces and they look perfect! 
The two remaining door frames in the hallway were sanded, primed and painted before prepping the walls for FRP panels.



Mary cleaning up after the over-all hallway sanding. 










Our beautiful new panels!!
Right side of the hallway. The left side still needs to be done.

Stopping an annoying leak in the aft cabin we recently painted.