The painting in much of the aft crew cabin is completed. There is still one closet next to the doorway that will be worked on once the old plumbing and wiring has been removed. The floor still needs sanding and painting and the overhead is not installed.
There is a lot of space under the bunks and we have begun to fill containers with various items as we sort through the stuff brought over from the storage unit. We are planning on being out of the storage unit by the end of this month.
God has provided the funds to complete the wood-shop! This will entail putting in an overhead, building tool storage on the walls and installing the lathe. Some of the containers are the perfect size to place under the lift-up flooring in the shop. These will provide lots of precious storage for our many tools and shop supplies.
The windy/rainy weather was really slowing us down so some of the painting was done in the main salon.
First coat of paint on the crew cabins' dresser drawers.
These are the doors for the opening under the bunks. They will be lightly sanded and coated with a clear finish.
These holes will be hidden by blank electrical outlet covers.
The wood around the overhead edges will be cut flush with the walls.
The floor still needs sanding and painting
A lot of wonderful storage space under each bunk!
The aft crew quarters
A sampling of stuff from the storage unit needing to be organized into the ship. The five containers in front are the perfect size for under the floors in the wood shop.