Monday, May 11, 2015

Starting Phase II

Eric and Mary have just returned from delivering a load of supplies to the boat. The week was spent sorting and storing supplies, ordering batteries, inverters, rope and laying out plans for the future wood shop and various renovations soon to take place. DJ now has most of the electrical supplies, components and equipment to begin Phase II. He will be renovating the electrical system as well as various smaller jobs to prepare for Phase III which will be building the wood shop and renovating the forward cabins. 

Eric and Mary are hoping to move aboard permanently later this year. Once the electrical system is straightened out it will be time to put our small boat up for sale and prepare for the move to the big boat. Eric is also straightening out some health issues with the VA before moving. The vessel needs a lot of work still to prepare her for departure and to perform her duties properly and safely for the many years ahead in the mission field. Please keep our work and calling in prayer as we trust God to meet all our needs.


Lots of heavy duty wire along with a powerful manual bilge pump.

 Scrap building materials of plexiglass, micarta, starboard, etc...

 Air hoses, fiberglass, shrink wrap for wires, etc... 

 More building materials.

 Everything getting stored in a few of our
 numerous storage compartments.

 Storage for now in the cabins that will be renovated.


 Eric and DJ bringing the drill press on board with the boom crane.

 Man handling the drill press into the main salon.

 The drill press will have a home in the future wood shop.

 600ft of 1 1/2" rope

 Lowering the rope into the aft lazarette.
We are seriously loving this crane!

 The main salon back in shape for a short while.

The back deck scrubbed and cleaned. Penny approves!